Doubler install 

Installation of Northwest Fabworks eco box. project consists of doubler install, shifter install, floor modification, front and rear drive shafts, exhaust, skid plate migration

Interesting for you

Relocation

Relocation

Fabrication
Relocated my battery's under the bed and remade all the lines and made a access hole in the bed
Been looking around for a good suicide door kit!!! Been sick alot lately and packing to move soon..

Been looking around for a good suicide door kit!!! Been sick alot lately and packing to move soon..

Fabrication
Want to find a good suicide door kit . . . For this is a budget build . . . Project at a stop till move is done. . . . Been sick alot lately. . ....
My new toy

My new toy

Fabrication
This is my 2008 Ford Mustang convertible , I've never owned a convertible before but ever since I sold my last mustang I had regrets so this will...
front cab mount relocation

front cab mount relocation

Fabrication
so in the process of ever better turning radius with the massive wheels and tires and increased turning radius from the Dirt king lower control...
Front Bumper

Front Bumper

Fabrication
Spent part of the day friday, all day saturday and part of the day sunday on this one. Picked up the 20 foot of 3/16" 2"x4" square tubing steel...
Ratrod trailer

Ratrod trailer

Fabrication
Ive been working on the ratrod trailer a little more lately. Got the frame mostly finished. Im putting an old trunk in where the engine used to be...